Installing the Universal Two-Post Rack Kit (XEN-R000294)
Hardware devices illustrated in these procedures are only for reference and may not depict the device you are installing in the
rack.

Installation requirements

Review the installation and facility requirements for your product before mounting the device . Refer to the hardware installation guide for
your product for more information.
Lifting requirements
For 1U and 2U devices, two people are required to install the device in a rack. One person holds the device, while the other screws in the
front and rear "L" brackets.

Time and items required

Allow 15 to 30 minutes to complete the installation.
The following items are required to install the device using the Universal Two-Post Rack Kit:
#2 Phillips torque screwdriver
1/4-inch slotted-blade torque screwdriver

Parts list

The following parts are provided with the Universal Two-Post Rack Kit (XEN-R000294).
32
ExtremeSwitching SLX 9030 Hardware Installation Guide
9035691-02 Rev AD