Trane 4TXK6512G1000AA Service Manual page 127

Table of Contents

Advertisement

The top and two side surfaces must be exposed to open space, and barriers on at least one side of the front and
back shall be lower than the outdoor unit .
2 . Multi-unit installation (unit: mm)
3 . Multi-unit installation in front and back (unit: mm)
The top and two side surfaces must be exposed to open space, and barriers on at least one side of the front
and back shall be lower than the outdoor unit .
 The installation service spaces shown in the illustrations are based on an air intake temperature of 35 °C(DB) for
COOL operation . In regions where the air intake temperature regularly exceeds 35°C(DB), or if the heat load of
outdoor units is expected to regularly exceed the maximum operating capacity, reserve a larger space than that
indicated at the air intake side of units .
 Regarding the required air outlet space, position the units with consideration to the space required for the onsite
refrigerant piping work as well . Consult your dealer if the work conditions do not match those in the drawings .
Drain pipe disposal
 Make sure the drain works properly .
 In regions where buildups of snow can be expected, the accumulation and freezing of snow in the space
between the heat exchanger and external plate may lower operating efficiency .
 After punching the knock-out hole, the application of repair-type paint on the surface around the edge sections is
recommended to prevent rust .
Back and side
Above 150 Above 300 Above 300 Above 300
Front and back
Above 3
Above 300 Above 300
Height of barriers is below that of outdoor unit
Above 300 Above 300
S t d d
Standard
Above 1000
A
Above 200
Above 2000
1 0 3

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents