Power Supply Sequence And Handling Of I/O Data - Mitsubishi Electric CC-Link-AnyWire Bitty Bridge User Manual

Table of Contents

Advertisement

2.2.3

Power supply sequence and handling of I/O data

An incorrect input/output may occur depending on the supply procedure of the power of the NZ2AW1C1BY and the
power supply for slave module. Pay attention to the following points.
• Do not make the access related to this module until the remote station READY signal turns on after powering
on the NZ2AW1C1BY.
• Supply the power according to the steps below.
1.
Turn on the programmable controller (CC-Link master module).
2.
Turn on the bridge module (NZ2AW1C1BY).
3.
Turn on the slave module (when isolated I/O module is used).
4.
Turn on (for 500ms or longer) and off Error reset request flag before accessing the slave module.
CHAPTER 2 SPECIFICATIONS
19
2

Advertisement

Table of Contents
loading

This manual is also suitable for:

Nz2aw1c1by

Table of Contents