Installation Procedures; Determine Slots And Shelves; Set Switches - Nortel Communication Server 1000S Installation And Configuration Manual

Isdn primary rate interface
Hide thumbs Also See for Communication Server 1000S:
Table of Contents

Advertisement

Page 208 of 394

Installation procedures

Determine slots and shelves

Set switches

553-3001-201
Standard 2.00
Clock Controller description and installation
This section provides procedures on how to install a clock controller on Large
Systems.
CAUTION
Do not deviate from the procedures described in this
section. Call processing can stop if procedural steps
are not followed properly.
Table 64 shows the systems, the shelves and available slots.
Table 64
Clock Controller shelves and slots
System
Half Group,
Single Group
Multi Group
Before installing a clock controller, set the switches as shown in Table 65,
Table 66, and Table 67. Table 65 on
different vintages of the QPC471. Table 66 on
for the QPC775. Table 67 on
September 2004
Shelf
NT6D39 CPU/NET
NTDA35 Network Module
page 209
page 210
shows settings for the NTRB53.
Slot(s)
9
13
displays the settings for
page 209
shows the settings

Advertisement

Table of Contents
loading

Table of Contents