Alcatel-Lucent OmniSwitch 6850-48 Management Manual page 181

Release 6
Hide thumbs Also See for OmniSwitch 6850-48:
Table of Contents

Advertisement

Managing CMM Directory Content
Cancelling a Rollback Timeout
To cancel a rollback time-out, enter the reload cancel command as shown:
-> reload primary cancel
or
-> reload cancel
The
reload working
OmniSwitch AOS Release 6 Switch Management Guide
command is described in detail in the OmniSwitch CLI Reference Guide.
Managing the Directory Structure (Non-Redundant)
September 2009
page 5-19

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents