5.2. Junction Unit

RJ45
coupler
From ATU

5.3. Data Processing Unit

Sample image of DPU
3
From DPU
1
4
2
1. AC power connection
Connect the power cable from ATU to the
terminal block (T1-3), and connect the power
cable from DPU to the terminal block (T5-7).
Caution: Do not plug in or turn on the power
breaker (DPU side) at this moment.
- Measure the voltage of AC power at the
terminal block after turned on or plugged in
the main power.
- Reference range: 100V to 240V ±10%
<Wire color>
Type
JIS
P/L
Black
+
N
-
White
Green/
GND
FG
Yellow
2. LAN connection
Connect LAN cables from ATU to the RJ45
coupler, and connect LAN cables from DPU to
the other side of RJ45 coupler with the correct
cable.
1. Setup Data Processing Unit
(1) Connect AC power supply cord from
electrical outlet to DPU, and turn ON the
power. (Turn ON the power of ATU before
turn ON the power of DPU)
(2) Connect LAN cable from DPU to ATU
(SPU), and setup IP address of DPU.
(192.168.31.110)
(3) Use USB / LAN adapter if only 2 LAN
connectors are mounted. Connect
(MONI-CON), and setup IP address of
DPU. (192.168.1.80)
(4) Connect LAN cable from router to DPU for
using Internet. (e.g.: 192.168.0.5)
Notice: Do not use the same IP address as
ATU.
14
S2E-17-0056_A
IWR
US
EU
Black
Black
Brown
White
White
Blue
or Gray
Red
Green/
(Terminal
Green
Yellow
Green)

Advertisement

Table of Contents
loading

Table of Contents