C1
6. Every location must have to measure a length in between ATU JCU DPU for
adjustment. And to lay the Protecting Tube.
ATU
C2
Fix cables by cable ties.
12
4. Insert the outdoor cable into the
protecting tube (2 pcs).
Protecting Tube 1:
- C1: AC Power cable (3cores)
- C2: LAN cable x2
Protecting Tube 2:
Cover by cap
※ Fix cables tight by cable ties with having
extra cable length after connected
cables.
5.Cover the top of radome
- Fix the bottom part of radome by 12
pcs of M10x35 Hex Bolts. These are
using a dropout prevention fixed bolts.
JCU
S2E-17-0056_A
DPU
(Indoor)