Component Replacement and Plant Changes
5.1 Failure and replacement of bus components
Replace the Route Control server.
Follow the steps below to replace a Route Control server:
Step
1
2
3
4
Replacing the Route Control client
Follow the steps below to replace a Route Control client:
Step
1
2
3
4
186
What?
Replace the Route Control server.
On the engineering station: Open Route Control Engineering and download the Route Control
server
Start Route Control (Route Control starts as standby server).
Update the Route Control servers using the Route Control Center, so that both Route Control
servers operate with the same database.
What?
Close the Route Control Center.
Replacing the Route Control client.
On the engineering station: Download Route Control client from the SIMATIC Manager or
Route Control Engineering.
Open the Route Control Center.
Fault-tolerant Process Control Systems (V8.1)