4.4
Commissioning with the BOP-2
Plugging on the BOP-
2
Figure 4-4
Frequency inverters with Control Units CU230P-2 HVAC, CU230P-2 DP, CU230P-2 CAN
Operating Instructions, 01/2011, FW 4.4, A5E02430659B AD
Removing the BOP-2
Operator control and display elements of the BOP-2
4.4 Commissioning with the BOP-2
The "Basic Operator Panel-2" (BOP-2) is an
operation and display instrument of the
converter. For commissioning, it is directly
plugged onto the converter Control Unit.
Commissioning
63