Daikin SkyAir RZR-P Series Engineering Data page 221

Cooling only 60hz, heat pump 60hz, r-410a, inverter
Hide thumbs Also See for SkyAir RZR-P Series:
Table of Contents

Advertisement

Installation of outdoor unit
Pay a special attention to the place, such as a basement,
etc. where refrigerant can stay, since refrigerant is heavier
than air.
Procedure for checking maximum concentration
Check the maximum concentration level in accordance with
steps 1 to 4 below and take whatever action is necessary to
comply.
1.
Calculate the amount of refrigerant (lb.) charged to each
system separately.
amount of refriger-
ant in the unit
(amount of refriger-
ant with which the
system is charged
before leaving the
factory)
NOTE
Where a single refrigerant facility is divided into 2 entirely
independent refrigerant systems then use the amount of
refrigerant with which each separate system is charged.
2.
Calculate a room volume (ft³)
3.
Calculate the refrigerant concentration by using the results
of the calculations in steps 1 and 2 above.
total amount of refrigerant in the
system
volume (ft³) of the room in which there
is an indoor unit installed
4.
Deal with the situations where the result exceeds the
maximum concentration level.
Where the installation of a facility results in a concentration
in excess of the maximum concentration level then it will be
necessary to revise the system.
Please consult your dealer.
English
220
additional charging
total amount
amount (amount of
of refrigerant
+
=
refrigerant added
(lb.) in the
locally in accordance
system
with the length or
diameter of the
refrigerant piping and
type of indoor unit)
maximum concentration
level (lb./ft³)
EDUS281120_a
18
3P281953-2A
RZR-P, RZQ-P(9)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents