Daikin SkyAir RZR-P Series Engineering Data page 125

Cooling only 60hz, heat pump 60hz, r-410a, inverter
Hide thumbs Also See for SkyAir RZR-P Series:
Table of Contents

Advertisement

Installation of indoor unit
Not recommendable but in case of emergency
You must use a torque wrench but if you are obliged to install the unit without a torque wrench, you may
follow the installation method mentioned below.
When you keep on tightening the flare nut with a spanner, there is a point where the tightening torque
suddenly increases. From that position, further tighten the flare nut the angle shown below:
Pipe size
φ 1/4
φ 3/8
φ 1/2
φ 5/8
After the work is finished, make sure to check that there is no gas leak.
• Make absolutely sure to execute heat insulation works on the pipe-connecting section after checking gas
leakage by thoroughly studying the following figure and using the attached heat insulating materials for
fitting (8) and (9). (Fasten both ends with the clamps (4).) (Refer to Fig. 16)
• Wrap the sealing pad (11) only around the insulation for the joints on the gas piping side. (Refer to Fig. 16)
Gas Piping Insulation Procedure
Insulation for fitting (8)
(accessory)
Flare nut connection
Turn seams up
Piping insulation
material
(Field supply)
Liquid Piping Insulation Procedure
Insulation for fitting (9)
(accessory)
Flare nut connection
Turn seams up
Piping insulation
material
(Field supply)
CAUTION
For field insulation, be sure to insulate field piping all the way into the pipe connections inside the machine.
Exposed piping may cause condensation or burns on contact.
12
124
Further tightening angle
60 to 90 degrees
60 to 90 degrees
30 to 60 degrees
30 to 60 degrees
Piping insulation
material (main unit)
Attach to base
Main unit
Clamp (4) (accessory)
Tighten the part other
than the piping insulation
material.
Piping insulation
material (main unit)
Attach to base
Main unit
Clamp (4) (accessory)
Tighten the part other
than the piping insulation
material.
Recommended arm length of tool
Approx. 6in.
Approx. 8in.
Approx. 10in.
Approx. 12in.
Wrap over from the
base of the unit to
the top of the flare
nut connection.
Sealing pad
medium-1 (11)
(accessory)
Wrap the
insulator around
the part from the
root.
Liquid piping
Screw mounting part
Sealing pad
of piping presser plate
medium-2 (12)
(accessory)
EDUS281120_a
Gas piping
(2 locations)
Fig. 16
English
3P161684-6K
RZR-P, RZQ-P(9)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents