Daikin SkyAir RZR-P Series Engineering Data page 199

Cooling only 60hz, heat pump 60hz, r-410a, inverter
Hide thumbs Also See for SkyAir RZR-P Series:
Table of Contents

Advertisement

Installation of indoor unit
(2) Lay the wires in the control box through the wire inlet on the
side of the control box.
Elbow
(Field supply)
Conduit
(Field supply)
Low-voltage wiring inlet
Transmission wiring
(Low voltage)
Remote controller wiring
(Low voltage)
High-voltage wiring inlet
Power supply wiring (High voltage)
Ground wiring (High voltage)
CAUTION
• Do not lay the remote controller wiring or transmission wiring
along with the power supply wiring or other electric wiring in
the same route. Separate the remote controller wiring and
transmission wiring at least 2 in. from the power supply wiring
or other electric wiring, or otherwise malfunctions or failures
may be caused by external electric noise that may interfere
with the remote controller wiring and transmission wiring.
• For the installation and wiring of the remote controller, refer to
the remote controller installation manual provided with the
remote controller.
• For power supply wiring, refer to the wiring diagram as well.
• Be sure to connect the remote controller wiring and transmis-
sion wiring correctly to the right terminal block.
12
198
Lock nut
(Field supply)
(3) Follow the instructions below, and lay the wires in the con-
trol box.
Fix the wires with
Transmission
clamp (8) to the
wiring (Low voltage)
wire fixing bracket
Remote controller
provided to the
wiring (Low voltage)
control box.
Conduit
(field supply)
Power supply wiring
(High voltage)
Ground wiring
(High voltage)
Insulation tube
(accessory (12))
L
L
Ground
1
2
Connection method of
power supply terminals
(X1M)
Twist and fix the upper part so
that the wires will not drop out.
Fix the cord with the
clamp (8) to the wire
fixing bracket provided
to the control box.
Routing power supply wiring and transmission wiring
Let the power supply wiring with a conduit pass through one of
the holes on the side cover, and let the transmission wiring with
a conduit pass through another hole.
• For protection from uninsulated live parts, thread the power
supply wiring or the transmission wiring through the included
insulation tube and secure it with the included clamp.
Insulation tube
Clamp
(accessory (12))
(accessory (8))
When use the insulation tube
• Cut off the insulation tube as need length.
WARNING
Trim and lay the wiring neatly and attach the control box
cover securely.
An electric shock or fire may result if the control box cover
catches any wiring or the wires push up the cover.
EDUS281120_a
Insert the cord into
the wire clips
provided with the
control box.
PROHIBITED
Never connect the power
supply wiring.
P
1
P
2
F
1
F
2
T
1
T
2
Transmission wiring
(No polarity)
Remote controller
wiring (No polarity)
Connection method of remote
controller terminals (X2M)
• If stranded wires are used, do
not solder the front end of the
wires.
Power supply wiring
or
Transmission wiring
(3in.)
Cut off
English
3PN14093-12A
RZR-P, RZQ-P(9)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents