Installation of indoor unit
4.
INDOOR UNIT INSTALLATION
Use only accessories and parts which are of the designated specifi cation when installing.
CAUTION
Install so that the unit does not tilt to either side or forward.
Do not hold the unit by the horizontal fl aps when lifting it. (This may damage the horizontal fl aps.)
(1)
Open the piping through-hole.
The refrigerant pipe and drain pipe can be passed out in one of 5 directions: left, bottom-left, back-left,
bottom-right, and back-right. (Refer to Fig. 3)
Using the paper pattern for installation (3), choose where to pass the piping out and open a through-
hole (φ3 1/8") in the wall.
Open the hole so that there is a downward slope for the drain piping. (See " 6.DRAIN PIPING WORK ")
(2)
Remove the installation panel (1) from the unit and attach to the wall.
(The installation panel is temporarily attached to the unit with a screw. (In case of 12 type))
(Refer to Fig. 3)
(a) Check the location for the hole using the included paper pattern for installation (3).
Choose a location so that there is at least a 3 1/2" gap between the ceiling and the main unit.
(b) Temporarily attach the installation panel (1) at the temporary-securing position on the paper pattern for
installation (3) and use a level to make sure the drain hose is either level or tilted slightly downward.
(c) Secure the installation panel (1) to the wall using either screws or bolts.
If using the attachment screws for the installation panel (2), attach using at least 4 screws on
either side (for a total of 9 screws) of the recommended installation cleat position on the included
paper pattern for installation (3).
If using bolts, attach using a M8 - M10 bolt or equivalent (for a total of 2 bolts) on either side.
If dealing with concrete, use commercially available foundation bolts (M8 - M10 or equivalent).
(3)
If using the left, bottom-left, or bottom-right positions for the piping, cut out the through-hole for
the piping in the front grill . (Refer to Fig. 4)
Fig. 3
7
172
Installation panel (1)
Temporary screw
(In case of 12 type)
Bottom-left pipe
Back-right pipe
Bottom-right pipe
Left pipe
Back-left pipe
EDUS281120_a
Front grill
Cut out along
the groove.
Cut away
Fig. 4
English
3PN07521-2C
RZR-P, RZQ-P(9)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents