Daikin SkyAir RZR-P Series Engineering Data page 201

Cooling only 60hz, heat pump 60hz, r-410a, inverter
Hide thumbs Also See for SkyAir RZR-P Series:
Table of Contents

Advertisement

Installation of indoor unit
2. When using 2 remote controllers
Power Supply
208/230V
1 ~ 60Hz
[ PRECAUTIONS ]
1. Make sure that the ground fault circuit interrupter is
designed to protect the air conditioner from ground faults,
overloads, and short-circuiting.
2. The remote controller wiring (P1 and P2) and transmission
wiring (F1 and F2) have no polarity.
10-3 CONTROL BY 2 REMOTE CONTROLLERS (Con-
trolling 1 indoor unit by 2 remote controllers)
• Set one of the remote controllers to main and the other to sub
in the case of remote control with two remote controllers.
Switching Main/Sub
• The setting of the BRC1E71 remote controller should be
switched referring to the manual supplied with the remote
controller.
• In case of BRC1D71 remote controller.
(1) Insert a
screwdriver into the clearance between the
grooves of the lower casing and the upper casing to remove
the upper casing. (2 grooves) (The remote controller PCB is
attached to the upper casing.)
Insert the screwdriver here and gently work
off the upper part of remote controller.
14
200
Outdoor unit
Control box
IN/D OUT/D
F
F
F
F
1
2
1
2
L
L
1
2
L
L
P
P
F
F
T
T
1
2
1
2
1
2
1
2
Indoor unit
P
P
P
P
1
2
1
2
For use with
2 remote
controllers
Upper part of
remote controller
Lower part of
remote controller
(2) Set the main/sub switch on one of the remote controller
PCBs to sub. (Keep the switch of the other remote controller
PCB set to main.)
S
S
(Factory setting)
M
Only one remote
S
controller needs to be
M
changed if factory
settings have
remained untouched.
10-4 COMPUTERIZED CONTROL (FORCED OFF
AND ON/OFF OPERATION)
(1) Wire specifications and how to perform wiring
• Connect the external input to terminals T1 and T2 of the
terminal block for remote controller.
F2
T1
FORCED
OFF
Wire specification
Gauge
AWG18-
Length
Max. 328 ft
Contact that can ensure the minimum appli-
External terminal
cable load of 15 V DC, 1 mA.
(2) Actuation
• The following table explains FORCED OFF and ON/OFF
OPERATIONS in response to Input A.
FORCED OFF
Input "ON" stops operation (impossible by
remote controllers.)
Input OFF enables control by remote con-
troller.
(3) How to select FORCED OFF and ON/OFF OPERATION
• Turn the power on and then use the remote controller to
select operation.
10-5 CENTRALIZED CONTROL
• For centralized control, it is necessary to designate the group
No. For details, refer to the manual of each optional control-
lers for centralized control.
EDUS281120_a
Remote controller
PC board
T2
Input A
ON/OFF OPERATION
Input OFF → ON turns
ON unit.
Input ON → OFF turns
OFF unit.
English
3PN14093-12A
RZR-P, RZQ-P(9)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents