Start-Up Checklist - Carrier WeatherMaster Puron 48HC D17 Service And Maintenance Instructions

Gas heat/electric cooling with r-410a refrigerant
Table of Contents

Advertisement

NOTE: To avoid injury to personnel and damage to equipment or
property when completing the procedures listed in this start-up
checklist, use good judgment, follow safe practices, and adhere to
the safety considerations/information as outlined in preceding sec-
tions of this Service and Maintenance Instruction document.
I. PRELIMINARY INFORMATION
MODEL NO. ____________________________________________
JOB NAME _____________________________________________
SERIAL NO.. ___________________________________________
ADDRESS _____________________________________________
START-UP DATE________________________________________
TECHNICIAN NAME _____________________________________
ADDITIONAL ACCESSORIES
_____________________________________________________________________________________________________
II. PRE-START-UP
Verify that jobsite voltage agrees with voltage listed on rating plate (Y/N) _____
Verify that all packaging materials have been removed from unit (Y/N) _____
Remove all shipping hold-down bolts and brackets per installation instructions
Verify installation of outdoor air hood (Y/N) _____
Verify installation of flue exhaust and inlet hood (Y/N) _____
Verify that condensate connection is installed per instructions (Y/N) _____
Verify that all electrical connections and terminals are tight (Y/N) _____
Check refrigerant piping for indications of leaks; investigate and repair, if necessary (Y/N) _____
Verify gas pressure to unit gas valve is within specified range (Y/N) _____
Check gas piping for leaks (Y/N) _____
Check that indoor-air filters are clean and in place (Y/N) _____
Check that outdoor-air inlet screens are in place (Y/N) _____
Verify that unit is level (Y/N) _____
Check fan wheels and propeller for location in housing/orifice and verify setscrew is tight (Y/N) _____
Verify that fan sheaves are aligned and belts are properly tensioned (Y/N) _____
Verify installation of thermostat (Y/N) _____
Verify that crankcase heaters have been energized for at least 24 hours (Y/N) _____
Check to ensure that electrical wiring is not in contact with refrigerant lines or sharp metal edges (Y/N) _____
Check pulley alignment and belt tension per installation instructions
III. START-UP
ELECTRICAL
Supply Voltage
Compressor Amps 1
Compressor Amps 2
Supply Fan Amps
Indoor Fan Amps
Outdoor Fan Amps
TEMPERATURES
Outdoor-air Temperature
Return-air Temperature
Cooling Supply Air Temperature
Gas Heat Supply Air Temperature
Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.
Catalog No. 04-53480242-01
UNIT START-UP CHECKLIST
(Remove and Store in Job File)
L1-L2_____________
L1 _____________
L1 _____________
L1 _____________
________________
________________
_____________ °F DB (Dry Bulb)
_____________ °F DB
_____________ °F
_____________ °F
Printed in U.S.A.
Form 48HC-17-28-02SM
L2-L3_____________
L2 _____________
L2 _____________
L2 _____________
________________
________________
_____________ °F Wb (Wet Bulb)
Pg CL-1
2-2020
L3-L1_____________
L3 _____________
L3 _____________
L3 _____________
________________
________________
Replaces: 48HC-17-28-01SM

Advertisement

Table of Contents
loading

Table of Contents