Start-Up Checklist - Carrier 38AUD Installation, Start-Up And Service Instructions Manual

Air cooled condensing units 50 hz with puron (r-410a) refrigerant
Table of Contents

Advertisement

I. PRELIMINARY INFORMATION
OUTDOOR: MODEL NO.
INDOOR:
AIRHANDLER MANUFACTURER
MODEL NO.
ADDITIONAL ACCESSORIES
II. PRE-START-UP
OUTDOOR UNIT
IS THERE ANY SHIPPING DAMAGE?
IF SO, WHERE:
WILL THIS DAMAGE PREVENT UNIT START-UP?
CHECK POWER SUPPLY. DOES IT AGREE WITH UNIT?
HAS THE GROUND WIRE BEEN CONNECTED?
HAS THE CIRCUIT PROTECTION BEEN SIZED AND INSTALLED PROPERLY?
ARE THE POWER WIRES TO THE UNIT SIZED AND INSTALLED PROPERLY?
CONTROLS
ARE THERMOSTAT AND INDOOR FAN CONTROL WIRING CONNECTIONS MADE AND CHECKED?
(Y/N)
ARE ALL WIRING TERMINALS (including main power supply) TIGHT?
HAS CRANKCASE HEATER BEEN ENERGIZED FOR 24 HOURS?
INDOOR UNIT
HAS WATER BEEN PLACED IN DRAIN PAN TO CONFIRM PROPER DRAINAGE?
ARE PROPER AIR FILTERS IN PLACE?
HAVE FAN AND MOTOR PULLEYS BEEN CHECKED FOR PROPER ALIGNMENT?
DO THE FAN BELTS HAVE PROPER TENSION?
HAS CORRECT FAN ROTATION BEEN CONFIRMED?
PIPING
ARE LIQUID LINE SOLENOID VALVES LOCATED AT THE INDOOR COILS AS REQUIRED?
HAVE LEAK CHECKS BEEN MADE AT COMPRESSOR, OUTDOOR AND INDOOR COILS,
TXVs (Thermostatic Expansion Valves), SOLENOID VALVES, FILTER DRIERS, AND FUSIBLE PLUGS
WITH A LEAK DETECTOR?
LOCATE, REPAIR, AND REPORT ANY LEAKS.
HAVE LIQUID LINE SERVICE VALVES BEEN OPENED?
HAVE SUCTION SERVICE VALVES BEEN OPENED?

START-UP CHECKLIST

SERIAL NO.
SERIAL NO.
(Y/N)
(Y/N)
(Y/N)
(Y/N)
(Y/N)
(Y/N)
(Y/N)
39
(Y/N)
(Y/N)
(Y/N)
(Y/N)
(Y/N)
(Y/N)
(Y/N)
(Y/N)
(Y/N)
(Y/N)