Milnor MWF63C7 Installation And Service page 10

Hide thumbs Also See for MWF63C7:
Table of Contents

Advertisement

Tag Guidelines for the Models Listed Below
Display or Action
Explanation
B2TAG94118: Do not strike shipping container during fork-
lifting. Fragile components inside.
B2T2001013: Hot water connection.
B2T2001014: Cold water connection.
B2T2001015: Reuse (third) water connection (optional).
B2T2001016: Flushing water connection. This is the water that
goes into the supply compartment or pumped chemical manifold
to flush chemicals into the machine (optional).
B2T2001028: Look for tags inside the machine. These tags may
identify shipping restraints to be removed or components to be
installed. Do not start the machine until these actions are
completed.
B2T2002013: Do not start the machine until shipping restraints
are removed. This tag will appear on the outside of the machine
to alert you to the presence of internal shipping restraints. A tag
will also appear on the restraint to help identify it. Most, but not
all shipping restraints display the color red. Some shipping
restraints are also safety stands. Do not discard these.
PELLERIN MILNOR CORPORATION
6