Weider WESY86301 User Manual page 18

Training system
Table of Contents

Advertisement

44. Locate the remaining preassembled pair of
Pulley Plates (31) and 3 1/2" Pulleys (82).
Route the High Cable (85) under the indicated
3 1/2" Pulley (82). The end of the Pulley
Plates (31) with two holes should be down-
ward. Refer to the inset drawing. Be sure
that the Cable is between the Cable Trap
(80) and the Pulley, and that the Cable Trap
is positioned to hold the Cable in place.
Tighten the 3/8" x 2" Bolt (50) and the 3/8"
Nylon Locknut (not shown).
45. Wrap the High Cable (85) around a 3 1/2"
Pulley (82). Attach the Pulley to the Top
Frame (2) with a 3/8" x 2" Bolt (50) and a 3/8"
Nylon Locknut (42). The Cable must be
routed from the direction shown.
46. Attach the High Cable (85) to a Small "U"
Bracket (32) with a 1/4" Nylon Locknut (44)
and a 1/4" Washer (37). Do not completely
tighten the Nylon Locknut. It should be
threaded onto the end of the Cable only a
couple of turns, as shown in the inset
drawing.
Attach the Small "U" Bracket (32) to the indi-
cated Weight Tube (25) with a 5/16" x 1 3/4"
Bolt (68) and a 5/16" Nylon Locknut (40).
47. Lay the Low Cable (86) over a 3 1/2" Pulley
(82). Attach the Pulley and both Pulley Covers
(94) to the Ab Upright (1) with the 3/8" x 4"
Bolt (95), two 3/8" Washers (38), and a 3/8"
Nylon Locknut (42). Do not overtighten the
Nylon Locknut; the Pulley should turn eas-
ily. Make sure that the Cable is between
the Pulley and the post, and that the Pulley
Covers are turned so the wide tabs are on
the indicated side.
44
85
50
31
End with two
holes should
be down
45
2
46
32
68
85
32
37
44
47
82
42
38
94
Wide Tabs
must be on
this side
1
18
85
82
80
42
50
82
85
85
40
37
44
25
Post
95
86
38

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

8630

Table of Contents