Vision Fitness ST200 Assembly Manual page 9

Functional trainer
Hide thumbs Also See for ST200:
Table of Contents

Advertisement

ORANGE BAG
1
STEP
• Lay the back side of the rear vertical
upright (1a) down onto the floor. The
threaded bolt ends will be pointing up.
Place the center floor support (1b) over the
threaded ends. Attach a flat (10.5x18x2T)
and spring (SW10.2x18.4x2.5T) washer
and nut (M10x1.5P) to each end. Tip
upright. Tighten fasteners using a 17mm
wrench and a 6mm L-shaped wrench.
• Slide the right floor support (1c) up to
the rear vertical support and attach with
two bolts (M10x1.5Px60L), two flat
(10.5x30x2T) washers (outside of tube),
two flat (10.5x18x2T) washers, and two
nuts (M10x1.5P). Repeat the process with
the left floor support (1d). Tighten with a
17mm wrench and a 6mm L-shaped
wrench. Attach the foot plate (1e) to the
front surface of 1b with two flat
(10.5x18x2T) & spring (SW10.2x18.4x2.5T)
washers, and two bolts (M10x1.5Px25L).
Tighten bolts with a 6mm L-shaped
wrench.
1d
1a
1b
1c
1e
9

Advertisement

Table of Contents
loading

Table of Contents