Vision Fitness ST200 Assembly Manual page 14

Functional trainer
Hide thumbs Also See for ST200:
Table of Contents

Advertisement

YELLOW BAG
6
STEP
Wrap one end of cable #1 around pulley
A. On the right side of the unit, place it
through pulleys B, C, D of 6a, and E.
Remove the nuts from 2 slotted bolts (M12)
(see diagram below). With the threads
pointing down on the slotted bolt (M12),
slide the end of cable #1 through it.
Reattach the nuts on the slotted bolt. Attach
C
it to one side of the rear termination bracket
B
E
(6b) with a 19mm wrench. Repeat on the
left side. Thread each bolt attached to 6b
evenly, on each side. The slotted bolt must
Cable #1
have a minimum of 0.5" of thread
engagement in the rear termination bracket
(6b). Insert the weight selector pin (6c)
anywhere in the weight stack. Finish by
tightening down the upper locking nut to
6a
the bolt head on each side and the lower
locking nut against the surface of 6b.
Failure to do so may result in improper
D
machine function or serious injury!
A
6b
6c
14

Advertisement

Table of Contents
loading

Table of Contents