2-5. IER-F + IER-F L-Type Installation
Cabinet Installation
• During L-type installation, a module covers another one. This direction can be determined, noting the L Support mark while installing
the Frame Kit.
Fig 24. L Support Marks and Module Overlapping Structure
Samsung Electronics
Module overlapping direction
from the current JIG point of
view
In case of opposite overlap,
use it upside down.
Fig 25. L Support Marks
95