Download Print this page
Samsung IAB Series Installation Manual
Samsung IAB Series Installation Manual

Samsung IAB Series Installation Manual

Hide thumbs Also See for IAB Series:

Advertisement

Quick Links

LED Display Install Manual
IAB Series
LH008IAB***
LH012IAB***
LH016IAB***
Ver. 0.9
LED R&D Lab(VD)

Advertisement

loading

Summary of Contents for Samsung IAB Series

  • Page 1 LED Display Install Manual IAB Series LH008IAB*** LH012IAB*** LH016IAB*** Ver. 0.9 LED R&D Lab(VD)
  • Page 2 Revision History Version Date (Y/M/D) Description 2022. 04. 23 P1.68 standard release LED R&D Lab(VD)
  • Page 3: Table Of Contents

    Table of contents 1. Product and installation information 2. preparation of Cabinet installation 3. Wall Mount 4. FRAME installation and cable connection 5. Frame Bezel Installation 6. Dehumidification mode guide 7. IP Manual setting Guide ※ Appendix1 - LED Module and Circuit replacement method ※...
  • Page 4: Product And Installation Information

    - This manual is an installation manual for IAB and can be applied to the model below.. (Installation specifications for each pitch are the same) Model Product appearance and information IAB series IAB Series : CoB Type / 120Hz Refresh Rate REMARK LED R&D Lab(VD)
  • Page 5 1. Product and installation information ◆ Model specification (IAB) 146” 110” Specification P0.84 (146”) P1.68 (146”) P1.26 (110”) 2422.7 3229.1 Horizontal Siza (mm) 1372.5 1826.1 Vertical 3840 1920 1920 Horizontal Pixels 2160 1080 1080 Vertical Module quantity 48 X 4, 192EA weight 26.5kg 26.5kg...
  • Page 6 1. Product and installation information ◆ Cabinet information 3229.1 49.5 2422.7 49.5 1826.1 146” 1372.5 110” LED R&D Lab(VD)
  • Page 7 1. Product and installation information ◆ Installation precautions (LED damage) precautions Image [External impact, fall caution] MODULE 1 Remove the cover-corner of the product before installation and do not Front impact the LED surface or drop it on the floor. ①...
  • Page 8 1. Product and installation information ◆ Installation precautions (LED damage) precautions Image [Caution of LED damage caused by liquid] When water or various chemicals touch the LED, the inside of the LED may be damaged. ① Water, dew, air conditioner condensate, sprayer, sweat, and saliva do not directly touch the product.
  • Page 9 1. Product and installation information ◇ Precautions for Appearance Washing ★ caution ★ - Be careful of damage when cleaning with a gap between Half-Cabinet. - Be careful of damage when cleaning between modules and modules in Half-Cabinet. - Do not put cloth or other substances between the gaps or spray detergent directly. It is recommended to wipe with a soft cleaning cloth provided with the product, and to wash with a small amount of glass cleaning agent provided with surfactant-based glass cleaning agent only if there is a...
  • Page 10 Video, created based on back light 10  Installation condition - Conditions for using SAMSUNG WALL MOUNT - Solar direct sunlight conditions cannot be installed (including glass window passage conditions) - It is recommended to use room temperature below 25°C...
  • Page 11 1. Product and installation information • Vertical wall installation (if Fan is not applied) set ~ ceiling minimum 30mm Air vent area set ~ floor minimum 30mm LED R&D Lab(VD)
  • Page 12 1. Product and installation information • Vertical landfill installation (when Fan is not applied) Recommended conditions: 500mm or more set ~ ceiling Air vent area At least 30mm (opening rate 100%) Minimum distance If the aperture ratio is not 100%, the separation distance = aperture ratio(%) / 100 At least 30mm (opening rate 100%) Recommended conditions: 500mm or more...
  • Page 13 1. Product and installation information • Precautions for Landfill Installation 150mm left and right space is required for service. (Fig.1)  Fixed screws are placed inside. , it is necessary to secure a field of view of about 150mm. (Fig. 2) ...
  • Page 14 1. Product and installation information ◆ Setup ready. ※ Recommended Specifications Electric driver PROTECTION JIG ASSY COVER P-HANDLE BN96-55707A (-) (+) driver • It is provided for Set accessories. (BN92-31412Y). ASSY ACC-WALL MOUNT BRACKET-LINK ASSY COVER P- ASSY ACC-WALL MOUNT (BN96-54014F) (BN61-18825A) DECORATION...
  • Page 15 1. Product and installation information ◆ Cabinet Accessories ASSY COVER P- BRACKET-LINK DECORATION Product warranty Easy setup guide Specification guide (BN61-18825A) (BN96-55520A~55523A) (It is not provided in some areas. It will be updated so that the components can be revealed (~5/30) SMPS SVC materials T-CON SVC materials WALL MOUNT ACC...
  • Page 16 1. Product and installation information □ Features when configuring the screen (differential specifications compared to the existing ones) ▶ Connection structure: Connection of signal cable (OCM) and power cable between P-FRAME and P-FRONT 1) P-FRAME Left/Right Connection - Cable Connection between AC Inlet Boards for Power On - Speaker Left/Right Cable Connection 2) Cable connection between P-FRAME + P-FRONT - Connect 4 OCM cables to the video output port of the main board...
  • Page 17 Table of contents 1. Product and installation information 2. preparation of Cabinet installation 3. Wall Mount 4. FRAME installation and cable connection 5. Frame Bezel Installation 6. Dehumidification mode guide 7. IP Manual setting Guide ※ Appendix1 - LED Module and Circuit replacement method ※...
  • Page 18: Preparation Of Cabinet Installation

    2. preparation of Cabinet installation ◆ Pre-prepare before installation ① Remove the tape of the top BOX and open it. (Fig.2) ② Remove the top–cushion. ③ Check the set status. (Two rear parts and four front parts) (Fig.3) Right1 Top-Cushion Left1 Accessory Right2...
  • Page 19 2. preparation of Cabinet installation ◆ Pre-prepare before installation ④ Open the bag shielding of the front module. Hold the internal COVER-CORNER, take out the set, and open the AL-Bag and disconnect the AL screws (4 in total). (Fig.4) SCREW POINT ⑤...
  • Page 20 Table of contents 1. Product and installation information 2. preparation of Cabinet installation 3. Wall Mount 4. FRAME installation and cable connection 5. Frame Bezel Installation 6. Dehumidification mode guide 7. IP Manual setting Guide ※ Appendix1 - LED Module and Circuit replacement method ※...
  • Page 21: Wall Mount

    3. Wall Mount Wall Mount Item 146” 110” ASSY BRACKET P-WALL REAR LEFT ASSY BRACKET P-WALL REAR RIGHT ASSY ACCESSORY-HOLDER ASSY BRACKET P ASSY ACCESSORY-SPACER BOLT-ETC HOLDER-BOLT HOLDER-WALL RING LABEL LEAFLET-WALL MOUNT BRACKET-SUPPORT LEFT RIGHT SCREW-SPECIAL SCREW-MACHINE SCREW-MACHINE SCREW-MACHINE SCREW-TAPTYPE BOLT-ETC BRACKET-LINK 3229.1*1826.1...
  • Page 22 Table of contents 1. Product and installation information 2. preparation of Cabinet installation 3. Wall Mount 4. FRAME installation and cable connection 5. Frame Bezel Installation 6. Dehumidification mode guide 7. IP Manual setting Guide ※ Appendix1 - LED Module and Circuit replacement method ※...
  • Page 23: Frame Installation And Cable Connection

    4. FRAME installation and cable connection ※ Cautions when fixing screws 1. A concrete or design wall with sufficient thickness; Standard Conditions for Installation according to the Types of Walls It can be installed on concrete or interior walls that are thick enough. Wooden pillars or MDF walls in gypsum boards If the wall is not flat, the gap...
  • Page 24 4. FRAME installation and cable connection ① Install the wall mount on the wall. (The same method as WALL 2.0) - Attach the leaflet to the wall to locate the wall mount. - Check the horizontal state using a laser leveler - Fix the left and right two points to the wall using the enclosed screw.
  • Page 25 4. FRAME installation and cable connection ② Before installing FRAME on Wall Mount, the following connection is required - Connect the power cable to the left frame and right frame, respectively - Connects 2 Power Cords - Since it is difficult to access after installation depending on the environment, connect the external terminal (HDMI, LAN, DP, etc.) cable to be used ※...
  • Page 26 4. FRAME installation and cable connection ③ What should be done when there is a gap between the LEDs (2x3) in the cabinet - Check the gap between the cabinet (2x3) LED modules before installation. - if there is a gap, screw the area of Figure 1 to adjust the height of the low part to the high part. Fig.2 into screw Fig1.
  • Page 27 4. FRAME installation and cable connection ④ Lift the ASSY BRACKET P-FRAME using BRACKET-HANDLE - Insert HANDLE into FRAME as shown in Figure 1. - As shown in FIG.2, push it in the direction of the arrow and fix it. - Fix two points per worker and lift at the same time.
  • Page 28 4. FRAME installation and cable connection ⑤ Install the ASSY BRACKET P-FRAME on the wall mount. - Install the LEFT first. - Fix it to the wall mount using BRACKET-WALL attached to the rear. - BRACKET-WALL SHAFT is used when horizontal adjustment between rear FRAME is required. BRACKET-WALL SHAFT BRACKET-WALL Fig.1 Install LEFT first...
  • Page 29 4. FRAME installation and cable connection ⑥ Install the ASSY BRACKET P-FRAME on the wall mount. - After installing the LEFT, install the RIGHT in the same way. - Assemble the combined parts of LEFT and RIGHT using screws. (4 POINTS) Fig.2 Assemble Fig.1 Install RIGHT LED R&D Lab(VD)
  • Page 30 4. FRAME installation and cable connection ⑦ Remove the HOLDER-GUIDE and assemble the BRACKET-LINK. - BRACKET-LINK assembles top and bottom HOLDER-GUIDE Fig.1 Remove HOLDER-GUIDE Fig.2 BRACKET-LINK assemble LED R&D Lab(VD)
  • Page 31 4. FRAME installation and cable connection ⑧ Connecting the cable in the frame section below ① Connect 10P to 10P Harness (BN39-02728A) connected to Right-Frame Inlet b’d to the bottom of Left-Frame Inlet b’d ② Connect Right-Frame Speaker Cable ↔ Left-Frame Speaker Cable LEFT-FRAME RIGHT-FRAME SMPS...
  • Page 32 4. FRAME installation and cable connection ⑧ Connecting the cable in the frame section below ③ Connect BN39-02743B (OCM) to Main OCM1 connector, spread it over the L1 frame fixed injection, and hang it. ④ Connect BN39-02743B (OCM) to Main OCM2 connector, spread it over the L2 frame fixed injection, and hang it. ⑤...
  • Page 33 4. FRAME installation and cable connection ⑨ Install the ASSY BRACKET P-FRONT by hanging it on the ASSY BRACKET P-FRAME.. - After installing 1st and 2nd in the middle, install them in order of 3rd and 4th. - Be sure to comply with the installation order - Since it is installed on hanging, it is raised and installed at an angle.
  • Page 34 4. FRAME installation and cable connection ⑩ Connect the cable below whenever you hang one ASSY BRACKET P-FRONT to the P-FRAME. - After creating a space by pulling the bottom of the P-FRONT, connect the OCM cable to the CN701 of the BN41-03045A board - After attaching P-FRONT to P-FRAME, connect BN39-02835A of P-FRONT and BN39-02833A of P-FRAME - The pile of cables exposed to the bottom of the set is pushed into the gap between P-FRONT and P-FRAME SMPS...
  • Page 35 4. FRAME installation and cable connection ⑪ Check the operation of each ASSY BRACKET P-FRONT installation. - Connect the power of the SET power cord to check whether the entire LED is damaged or not and check the output. Fig.2 Check the operation after installing two Fig.1 Check the operation after installing one Fig.3 Check operation after installing three Fig.4 Check operation after installing four...
  • Page 36 4. FRAME installation and cable connection ⑫ How to use PROTECTION JIG - Minimize damage to LED modules by attaching them when the waiting time is long or movement is required after installing the cabinet - It is also used when it is necessary to hold the side surface by hand. Fig.2 Fig.1 Jig attachment position LED R&D Lab(VD)
  • Page 37 4. FRAME installation and cable connection ⑬ After assembling two or more ASSY BRACKET P-FRONTs, match each other's Z gaps. < Z gap control method > - The concept of pushing up the lower side - Open the distance between the two modules. Figure 1 - Adjust the gap by turning the middle gear using the straight driver.
  • Page 38 4. FRAME installation and cable connection ⑭ When the ASSY BRACKET P-FRONT installation is complete, fix it with the BRACKET SUPPORT on the left and right sides. - BRACKET-SUPPORT assembly position is generally assembled with top/bottom center 3POINT. (Addable depending on the situation) - After assembling the SCREW-SPECIAL into the BRACKET-SUPPORT, turn it and push the inside.
  • Page 39 Table of contents 1. Product and installation information 2. preparation of Cabinet installation 3. Wall Mount 4. FRAME installation and cable connection 5. Frame Bezel Installation 6. Dehumidification mode guide 7. IP Manual setting Guide ※ Appendix1 - LED Module and Circuit replacement method ※...
  • Page 40: Frame Bezel Installation

    5. Frame Bezel Installation ① Install the left and right side bezels first. - Put the FRAME BEZEL SIDE on the left/right side of the CABINET and check if it does not match the screen. - Move the front position according to mismatch and attach it. Check the gap LED R&D Lab(VD)
  • Page 41 5. Frame Bezel Installation ② Install the FRAME BEZEL TOP at the top and screw it. - Place the FRAME BEZEL SIDE and FRAME BEZEL TOP/BOTTOM together so that there is no GAP. - The M3 screw enters into TOP/BOTTOM with FRAME BEZEL SIDE, and the M4 screw enters into CABINET. GAP : 0~0.1mm LED R&D Lab(VD)
  • Page 42 5. Frame Bezel Installation ③ Install FRAME BEZEL BOTTOM at the bottom and screw it. - In the case of the lower part, attach the BEZEL TOP + BEZEL BOTTOM. - When assembling the BEZEL BOTTOM, check the IR SENSOR location and attach it. FRAME BEZEL TOP FRAME BEZEL BOTTOM LED R&D Lab(VD)
  • Page 43 Table of contents 1. Product and installation information 2. preparation of Cabinet installation 3. Wall Mount 4. FRAME installation and cable connection 5. Frame Bezel Installation 6. Dehumidification mode guide 7. IP Manual setting Guide ※ Appendix1 - LED Module and Circuit replacement method ※...
  • Page 44: Dehumidification Mode Guide

    Dehumidification mode guide  If moisture penetrates the LED device, a short circuit in the device may occur in the long term, resulting in a line-type error.  In the case of LED products, it is advantageous to prevent moisture penetration due to the characteristics of LED modules and internal device structures.
  • Page 45 Dehumidification mode guide – Remote control hidden key method A. Definition Dehumidification pattern output start and dehumidification mode end for LED device unit (pixel) dehumidification of LED module are managed. B. Detailed description 1. In the sleep mode, the hidden key (MUTE → 3 → 7 → 9 → EXIT) enters the dehumidification mode. 2.
  • Page 46 Dehumidification mode guide – Remote control hidden key method C. Constraint 1. IR KEY is not processed except for hidden key (MUTE → 3 → 7 → 9 → EXIT) during dehumidification mode. 2. During dehumidification mode, AC OFF/ON of the right SYSTEM driver operates according to the "Auto-on" setting value.
  • Page 47 Dehumidification mode guide –  제습이 필요한 경우에 설치하는 방법 ※ 다음 페이지의 지침이 완료되기 전에 다른 컨텐츠를 재생하거나 사용하지 마세요. ※ 습기가 많은 지역에서는 습기 감소를 위해 제습기를 사용하면 효과가 있습니다. (야간 에어컨 미작동시 습기 상승되며, 이는 라인 디펙트의 요인이 될수 있음.) ※...
  • Page 48 Dehumidification mode guide –  제습이 필요한 경우에 설치하는 방법 3. 제품 설치 중에는, LSM에서 해당 패턴만을 재생하세요. • 스크린을 통해서 해당 패턴이 재생되는 것을 확인하세요. • 데이터 케이블이 올바르게 연결되었는지 확인 가능합니다. 4. 제품 설치가 완료되면, 24hr 제습을 시작해 주세요. LSM UX will be updated later 5.
  • Page 49 Dehumidification mode guide – In use In-device short circuits due to moisture can also occur during product use.  During use, please note below to maintain product quality.  − If any of the following conditions are met during the operation of the product, please dehumidify it. ...
  • Page 50 Dehumidification mode guide – Condensation due to overcooling  When the product surface is cooled too cold for ambient air temperature, or when hot and humid air meets the product surface while the surface is cooled, condensation can occur. (cf: The principle of water forming on the surface of a glass with ice) ...
  • Page 51 Dehumidification mode guide – Prevention of Condensation by A/C  Please make sure that the cold wind doesn't directly touch the screen. – When the cold wind from the screen surface A / C directly touches, condensation may occur depending on the ambient humidity and the temperature of the screen. –...
  • Page 52 Table of contents 1. Product and installation information 2. preparation of Cabinet installation 3. Wall Mount 4. FRAME installation and cable connection 5. Frame Bezel Installation 6. Dehumidification mode guide 7. IP Manual setting Guide ※ Appendix1 - LED Module and Circuit replacement method ※...
  • Page 53: Ip Manual Setting Guide

    7. IP Manual setting Guide IAB model Auto IP setting is as follows (shipment specification) SYSTEM(SLED) : 192.168.176.50 TCON(Cabinet) : 192.168.176.101 ~ 104 ※ Manual setting is required due to IP collision when using two or more IAB models using the same network (wired LAN) UHD model MAIN(SYSTEM) IP MAIN(SYSTEM) IP...
  • Page 54 7. IP Manual setting Guide ※ Factory mode IP Setting Factory – Control - The Wall Option – MANAGER/NETWORK – SLED IP SETTING SYSTEM(SLED) : 192.168.176.50 -> Toggle Write SLED IP when changing TCON(Cabinet) : 192.168.176.101 TCON Group Start IP Configuration Value Sequentially next group +1 ->...
  • Page 55 7. IP Manual setting Guide ※ instructions Return to Default shipment specification during Factory Reset - SYSTEM(SLED) : 192.168.176.50 - TCON(Cabinet) : 192.168.176.101 ~ 104 LED R&D Lab(VD)
  • Page 56 Thank you.
  • Page 57 Table of contents 1. Product and installation information 2. preparation of Cabinet installation 3. Wall Mount 4. FRAME installation and cable connection 5. Frame Bezel Installation 6. Dehumidification mode guide 7. IP Manual setting Guide ※ Appendix1 - LED Module and Circuit replacement method ※...
  • Page 58 Product disassembly method – 1) Screen Desorption MAGNET SCREW BRACKET-SUPPORT L/R SCREW MACHINE SCREW SPECIAL ① BEZEL TOP/BOTTOM disassemble : ② BEZEL SIDE disassemble : Magnet desorption ③ BRACKET-SUPPORT disassemble screw disassemble * Decomposition screen storage method SCREW ④ Separated in order of outside → inside (1 → 2) * Before separation, pull the bottom to create a space and ⑤...
  • Page 59 Product disassembly method – 2) Internal disassembly of docking station ① First fully connected state SMPS SMPS SMPS SMPS AC inlet AC inlet SYSTEM LED R&D Lab(VD)
  • Page 60 Product disassembly method – 2) Internal disassembly of docking station ② Power Cabling – Harness Cable disassembly Disassemble the Harness cable fastened to the SMPS and Board. Specification Q’ty Code BN39-02838 BN39-02837 BN39-02836 SMPS SMPS SMPS SMPS BN39-02309 AC inlet AC inlet SYSTEM BN39-02833...
  • Page 61 Product disassembly method – 2) Internal disassembly of docking station ② Power Cabling – Harness Cable disassembly Disassemble the Harness cable fastened to the SMPS and Board. Code Specification Q’ty BN39-02839 BN39-02728 SMPS SMPS SMPS SMPS AC inlet AC inlet SYSTEM LED R&D Lab(VD)
  • Page 62 Product disassembly method – 2) Internal disassembly of docking station ③ System Cabling – OCM Cable disassembly Disassemble the OCM cable fastened to the system board. Code Specification Q’ty BN39-02743 SMPS SMPS SMPS SMPS BN39- 02743A AC inlet AC inlet SYSTEM BN39- 02776A...
  • Page 63 Product disassembly method – 2) Internal disassembly of docking station ③ System Cabling – FFC Cable disassembly Disassemble the FFC cable fastened to the system board. Code Specification Q’ty BN96-55466 Folding,L280,24P BN96-55465 Wrinkle/Straight,L,68P SMPS SMPS SMPS SMPS AC inlet AC inlet SYSTEM LED R&D Lab(VD)
  • Page 64 Product disassembly method – 2) Internal disassembly of docking station ③ System Cabling – Speaker Cable disassembly Disassemble the speaker cable fastened to the SMPS Board. Code Specification Q’ty BN96-49998 TV-SPK,IAB,2ch,6ohm,10W SMPS SMPS SMPS SMPS AC inlet AC inlet SYSTEM LED R&D Lab(VD)
  • Page 65 Product disassembly method – 2) Internal disassembly of docking station ④ Decomposition of Board and Module Disassemble the system, tray board, and function module. Code Specification Shape Quantity M3 / L5 Total : 6 6001-003016 PWH / ZPC (WHITE) M3 / L8 Total : 4 6001-003436 PWH / ZPC (WHITE)
  • Page 66 Product disassembly method – 2) Internal disassembly of docking station ⑤ Board decomposition Disassemble the AC Inlet board. Quantit Code Specification Shape M3 / L5 6001-003016 Total : 14 PWH / ZPC (WHITE) M4 /L6 6001-002789 Total : 2 BH / ZPC (WHITE) subsidiary Code Specification...
  • Page 67 Product disassembly method – 2) Internal disassembly of docking station ⑥ Speaker disassemble By applying Hook Type, it can be disassembled without a separate tool LED R&D Lab(VD)
  • Page 68 Product disassembly method – 2) Internal disassembly of docking station ※ When disassembling SMPS, make sure to check whether it is ⑦ SMPS disassemble discharged or not. For more information, 'Trouble Shooting - SMPS Disassembly' Remove the screw 6 points that are fastened like the Insulator. Remove the screw 1 point that is fastened to SMPS alone.
  • Page 69 Product disassembly method – SMPS disassemble ※caution ◆ Caution: SMPS discharge Contactable area : Areas that can be touched without - When contacting or removing SMPS, use the discharge jig to the need for additional discharge check whether two discharge points are discharged or discharged. Uncontacted area : An area where touch is not possible without the need for additional...
  • Page 70 Product disassembly method – 3) Sub Screen Internal decomposition ① First fully connected state LED R&D Lab(VD)
  • Page 71 Product disassembly method – 3) Sub Screen Internal decomposition ② Bridge Board Cabling – FFC Cable Code Specification Q’ty 36 X 4 BN96- Wrinkle/Straight,L65,68P Total : 144 53691A LED R&D Lab(VD)
  • Page 72 Product disassembly method – 3) Sub Screen Internal decomposition ② Bridge Board Cabling – FFC Cable Code Specification Q’ty 6 X 4 BN96- Wrinkle/Straight,L100,68P Total : 24 54209A 3 X 4 BN96- Wrinkle/Fold,L230,68P Total : 12 55417A 3 X 4 BN96- Wrinkle/Fold,L230,68P Total : 12...
  • Page 73 Product disassembly method – 3) Sub Screen Internal decomposition ② Bridge Board Cabling – FFC Cable Code Specification Q’ty 2 X 4 BN96- Straight,L160,96P Total : 8 53430A 3 X 4 BN96- Straight,L160,68P Total : 12 55416A LED R&D Lab(VD)
  • Page 74 Product disassembly method – 3) Sub Screen Internal decomposition ③ Bridge Board Cabling – Harness Cable Code Specification Q’ty 13 X 4 BN39- Total : 52 02569A 2 X 4 BN39- Total : 8 02834A 1 X 4 BN39- Total : 4 02835A LED R&D Lab(VD)
  • Page 75 Product disassembly method – 3) Sub Screen Internal decomposition ④ Tcon, Upper, Lower B’d disassemble Code Specification Shape Quantity M3 / L5 22 x 4 6001-003016 PWH / ZPC (WHITE) Total : 88 LED R&D Lab(VD)
  • Page 76 Product disassembly method – 3) Sub Screen Internal decomposition ⑤ Bridge B’d disassemble Code Specification Shape Quantity M3 / L5 120 x 4 6001-003016 PWH / ZPC (WHITE) Total : 480 LED R&D Lab(VD)
  • Page 77 Product disassembly method – 4) LED module replacement □ Module disassemble ※ Decomposable to 2*3 23 screw Step adjustment Bridge Board 8 screw decomposition decomposition point Remova Floating Connector Remova ※ It is necessary to check if there is a screw at the step adjustment point Module to work with ④...
  • Page 78 Product disassembly method – 4) LED module replacement □ Module assembly Assemble 8 Bridge Assemble 23 Step adjustment Board Screws screws point Assem PUSH PUSH bling PUSH PUSH Assem bling PUSH PUSH ※ Step adjustment points are not required sections, and work only on sections that require height adjustment.
  • Page 79 Product reassembly method – 1) LED module step control □ Module-based step control 2. The step difference of the module is corrected by fastening the screw for step control to the step control If the corresponding point module is low hole.
  • Page 80 Product reassembly method – 2) Sub Screen □ Sub Screen Assembling ※ Assembly is in reverse order of disassembly. Assembling ① TCON, Lower, Upper, Bridge-Left/Right/mini ② FFC ④ Final ③ FFC, Harness Assembling completion Assembling LED R&D Lab(VD)
  • Page 81 Product reassembly method – 3) Docking Station □ Docking Station Assembling ※ Assembly is in reverse order of disassembly. ③ Speaker assembly ④ Assemble FFC cable, ① Assemble SMPS and AC inlet ② System, Tray board, Harness cable, OCM cable and integrated module assembly LED R&D Lab(VD)
  • Page 82 Product reassembly method – 4) Screen attachment □ Screen attachment Hang the top of the FRONT first and then attach the bottom. LED R&D Lab(VD)
  • Page 83 Product reassembly method – 5) Sub screen seam control □ Seam control between sub screens (X) After removing BEZEL, the gap between SUB SCREENs can be adjusted to SCREW to adjust the height difference, tilt between SUB SCREENs. LED R&D Lab(VD)
  • Page 84 Product reassembly method – 5) Sub screen seam control □ Seam control between sub screens (Y) After removing BEZEL, you can adjust the height difference, tilt between SUB SCREENs with SUB SCREEN top SCREW. LED R&D Lab(VD)
  • Page 85 Product reassembly method – 5) Sub screen seam control □ Seam control between sub screens (Z) Spread between SUB SCREENs and adjust the step using DRIVER. LED R&D Lab(VD)
  • Page 86 Table of contents 1. Product and installation information 2. preparation of Cabinet installation 3. Wall Mount 4. FRAME installation and cable connection 5. Frame Bezel Installation 6. Dehumidification mode guide 7. IP Manual setting Guide ※ Appendix1 - LED Module and Circuit replacement method ※...
  • Page 87 SVC – Firmware setting when replacing TCON board Be sure to proceed with all data updates in □ When replacing the TCON board order. Replace the Tcon board in the problematic part first -> Update Tcon data (Factory data, Gamma data) according to the following guide order LED R&D Lab(VD)
  • Page 88 SVC – Firmware setting when replacing TCON board Be sure to proceed with all data updates in □ When replacing the TCON board order. ① How to check the ID number of the replacement TCON - Check the ID value of the TCON corresponding to the SHOW ID on -> as shown in the figure below. ②...
  • Page 89 Table of contents 1. Product and installation information 2. preparation of Cabinet installation 3. Wall Mount 4. FRAME installation and cable connection 5. Frame Bezel Installation 6. Dehumidification mode guide 7. IP Manual setting Guide ※ Appendix1 - LED Module and Circuit replacement method ※...
  • Page 90 Appendix. Gradation Calibration - SMC Calibration 종류 Mobile Support Specifications Support model : S10/ S10+/ S20/ S20+/S21+ note 8/ 9/ 10/ 10+/ 20 Special models (flips, etc.) are not supported. LED R&D Lab(VD)
  • Page 91 Gradation Calibration - SMC Calibration 종류 Mobile calibration Cal reader Common : Notebook Tripod Lan cable Preparation Mobile phone material WIFI Router (or USB-C to LAN gender) Only Support IFH/IER/IFR/IEA/IFA IFH/IER/IFR/IEA/IWJ/IWR/IWA model IWJ/IWR/IWA/IAB Unit : Pixel Package type COB type Model Read R, G, B Pixel CC value Model...
  • Page 92 Gradation Calibration - SMC Mobile Solution IP Address Setting - Module Unit 192 . 168 . 176 . → IAB [Adjustment target screen] - Color correction after module replacement 192 . 168 . 176 . → notebook 192 . 168 . 176 . →...
  • Page 93 Gradation Calibration - SMC Preparation Caution work - IWJ, IWR model → SMC should be proceeded separately in Dynamic -. IP setting of WIFI router and IAB Peaking ON / OFF -. Check if the layout of all cabinets is normal in LSM. -.
  • Page 94 Gradation Calibration - SMC LSM setting MCE2 Check MCE2 icon is shown in mobile phone LOGIN UI is shown on first try. admin/ afg*gtc LED R&D Lab(VD)
  • Page 95 Gradation Calibration - SMC SMC 사용법 Check if it is set to Select ‘SubModuleCal’ ② ① Enter the IP of the IAB. ③ CONNECT click If connected normally, it is changed to CONNECT → CONNECTED and the layout information is displayed. ※...
  • Page 96 Gradation Calibration - SMC SMC 사용법 Check if it is set to Select ‘SubModuleCal’ ② ① ⑤ On the layout screen on the right, if you select a cabinet to specify as Reference, the cabinet will be displayed on the right. ③...
  • Page 97 Gradation Calibration – Adjust SMC Reference selection SMC 사용법 ⑥ Pattern Display for Auto Focus → Changed to Gray Pattern after Focus adjustment Adjust the screen to fit the screen. If the screen does not fit, slice the mobile phone screen to the right and adjust the screen to fit the screen using the zoom button on the pop-up window.
  • Page 98 Gradation Calibration - SMC ㅁ Selective adjustment : Adjust only the selected module (Target). Do not adjust the unselected module (none). (Maintain existing value) Only the modules to be adjusted are finely adjusted compared to the surrounding modules Module Selection Examples ① ~ ③ Ex ①...
  • Page 99 Gradation Calibration - SMC ㅁ Selection adjustment sequence ① After selecting the module to adjust, Click ‘NEXT’ ② Click ‘Adjust’ Selective adjustment ① ③ Calibration complete. 조정 대상 Selective Selective adjustment ② adjustment ③ [Before adjustment] [After adjustment]...
  • Page 100 Gradation Calibration - SMC Comparison of Target and Reference Selection Adjustments Cabinet Set Ref only Set Target only replacement Specifies only the reference. Specifies only the target → All other cabinets are processed as targets → Proceed with specified cabinet (or module only) cal reference Target Replaced cabinet...
  • Page 101 Gradation Calibration – SMC Manual control ㅁ Manual adjustment : Create a cal txt file by entering a manual layout and photographing the screen without connecting to the box. 1) Upload the layout information of the screen to be photographed to the mobile phone according to the following rules under the file name 'layoutInfo.txt' Mobile phone storage location : Save under ‘DCIM\MCE2\‘...
  • Page 102 Gradation Calibration – SMC Manual control 2) Changing Gradation CC Off in LSM 3) Display gray pattern to LSM : white, gray, dark gray...
  • Page 103 Gradation Calibration – SMC Manual control 4) After running SMC with mobile phone, select none (no connection) mode and select NEXT 5) Check if the image is saturated in SMC . SMC right sat. Check if the menu is 0% .
  • Page 104 Gradation Calibration – SMC Manual control 7) After uploading the Gradation CC file to LSM, change it to Gradation CC ON [Measure before adjustment] [Measure after adjustment]...

This manual is also suitable for:

Lh008iab seriesLh012iab seriesLh016iab series