Samsung IER Series Installation Manual page 41

Led display
Hide thumbs Also See for IER Series:
Table of Contents

Advertisement

5. S-Box Installation and Connection
Finishing the
HDBaseT cable after installation
 Fold and raise the drain wire above the RJ-45 connector. Use pliers to attach the deformation prevention parts together, as
shown below.
 Soldering of drain wire to metallic part of RJ45 connector: Solder the drain wire to the metallic part of the RJ45
connector and cut unnecessary parts out. Use a cable tester to the conductors and shield status (continuity).
Recommendation) Drain wire soldering + copper foil
Samsung Electronics

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ifr seriesIer-f seriesIfr-f seriesLh0 ier seriesLh0 ifr seriesLh020ier ls series ... Show all

Table of Contents