Samsung IER Series Installation Manual page 23

Led display
Hide thumbs Also See for IER Series:
Table of Contents

Advertisement

3. Frame Installation
② On the left end, place the ⓐBracket Side and fasten the screws to install the Bracket
※ Fasten one screw first, and use a clinometer to vertically align the right edges and fasten screws into the other holes.
(See the next page for precautions when fastening screws.)
Fasten the screws in the order of screw 1 → screw 2 → screw 3. Fig.1
ⓐ Fix the Bracket Side, following the measurements shown in Fig.4.
Fig.2 Screwing hole
Fig.1 Order of fastening the screws
a
b
d
Screwing
hole
c
b
b
Fig.3 Positions of
components to attach
Samsung Electronics
(Fig.3).
25 mm or above
a
12 mm or above
a
12 mm or above
Fig.4 Screw fastening position
based on screen
22

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ifr seriesIer-f seriesIfr-f seriesLh0 ier seriesLh0 ifr seriesLh020ier ls series ... Show all

Table of Contents