Samsung IER Series Installation Manual page 92

Led display
Hide thumbs Also See for IER Series:
Table of Contents

Advertisement

2-4. IER + IER-F Extension (Up to Down)
• Like the vertical extension of the IER Frame, use the Joint V and for this purpose, change the Stud location of the JIG F.
• However, in this case, the frames may not be aligned vertically. Accordingly, the
mandatory.
• Extended installation is the same as in IER.
• Fasten the Joint V to the Frame to extend.
• Insert the Joint V of the Frame to extend into the previous Frame for exact positioning, and then fasten the screws.
• The vertical gap between Frames after extension is 1 mm.
Fig 14. Before and After Changing the
JIG Stud Location
Frame to Install
Fastening M4
JOINT V
Installed Frame
vertical and horizontal checks
are
1mm
M4 SCREW
Fig 15. Vertical Extension
Samsung Electronics
IER-F
IER-F
91

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ifr seriesIer-f seriesIfr-f seriesLh0 ier seriesLh0 ifr seriesLh020ier ls series ... Show all

Table of Contents