Samsung IER Series Installation Manual page 21

Led display
Hide thumbs Also See for IER Series:
Table of Contents

Advertisement

2. Preparation for Cabinet Installation
Samsung Electronics
⑧ For cabinets placed on the edge, attach PET sheet before attaching PCB covers.
※ Attach PET sheet to all borders of the LED module (Fig.1), and attach PCB covers to the same outer sides where the
PET sheet has been attached (horizontally 5 points and vertically 4 points,
as shown by the blue borders in
Fig.2).
※ Attach PET sheet as shown in Fig.3. Make sure the area with no tape guides the LED module.
※ Attach PCB covers as shown in Fig.4.
No tape
0 to 0.5 mm
PET sheet
Fig.4
Fig.3
Fig.1 Attach PET sheet here
Fig.1 Attach PET sheet here
Fig.2 Borders requiring PET sheet and PCB covers
20
* Numeric figure: Quantity of PCB covers to attach

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ifr seriesIer-f seriesIfr-f seriesLh0 ier seriesLh0 ifr seriesLh020ier ls series ... Show all

Table of Contents