Pouring a Concrete Pad
Prepare a base for the concrete pad that meets all local code requirements. The base must have a
footing of 4 to 6 inches (10.2 to 15.2 cm) of sand or gravel on firmly compacted soil. Concrete
pad height is site and climate dependent. Height should be based on keeping the front door air
intake louvers and rear bottom exhaust vent free of obstruction. For dimensions of pad, refer to
Figure
28.
CLEARANCE
2.6.2
Mounting the Cabinet on a Concrete Pad
Use the following procedure to mount the cabinet on the concrete pad.
1. Fasten the pedestal mounts to the concrete pad using the customer-supplied hardware
identified in
Page 40
© 2007, ADC Telecommunications, Inc.
DOOR
92.0 IN.
(234 CM)
15.38 IN.
(39.07 CM)
3.5 IN.
(8.9 CM)
4.3 IN.
(10.9 CM)
Figure 28. Concrete Pad Dimensions
Figure
29.
31.0 IN.
(79 CM)
PEDESTAL ENCLOSURE
HOLES FOR
24.0 IN.
PEDESTAL
(61 CM)
MOUNT
29.00 IN.
(73.66 CM)
36.0 IN.
(91 CM)
RAN CABINET/
FOOT PRINT
CONCRETE PAD
(MINIMUM SIZE)
21308-A