Sign In
Upload
Manuals
Brands
ADC Manuals
Network Hardware
PG-FlexPlus PG-CAB001
ADC PG-FlexPlus PG-CAB001 Manuals
Manuals and User Guides for ADC PG-FlexPlus PG-CAB001. We have
1
ADC PG-FlexPlus PG-CAB001 manual available for free PDF download: Manual
ADC PG-FlexPlus PG-CAB001 Manual (70 pages)
Brand:
ADC
| Category:
Network Hardware
| Size: 1.37 MB
Table of Contents
Using this Technical Practice
4
Inspecting Your Shipment
4
Table of Contents
5
Field Cabinet Description
13
Introduction
13
Features
13
Construction and Finish
13
Weight
14
Dimensions
14
Figure 1. PG-Flexplus Field Cabinet Dimensions (Shown with Heat Exchanger)
14
Table 1. PG-Flexplus Field Cabinet
14
Table 2. PG-Flexplus Dimensions
14
Compartments
15
Electronics Compartment
15
Figure 2. PG-Flexplus Field Cabinet Layout (Front View - Shown with Field Cabinet Door Removed)
15
Side Chamber
16
Battery Compartment
16
Security
16
Environmental Control
16
Cooling System
16
6F-Fan Unit
17
Heat Exchangers
17
Table 3. Thermostat Temperature Set Points
17
Battery Heating and Cooling
18
Battery Heaters
18
Battery Cooling
18
Site Planning
19
Overview
19
Site Selection
19
Functional
19
Easement Size
19
Table 4. Standard Pad and Minimum Functional Easements
19
Thermal Site Considerations
20
Electrical Considerations
20
Safety
20
Right-Of-Way
21
Figure 3. PG-Flexplus Field Cabinet Clearance Requirements
21
Field Cabinet Installation
22
Overview
22
Handling
22
Storage
22
Figure 4. Securing a Packed Field Cabinet for Shipping
23
Figure 5. Securing an Unpacked Field Cabinet for Shipping
23
Field Cabinet Placement
24
Field Cabinet Grounding
24
Equipment and Materials Required for Field Cabinet Grounding
24
Field Cabinet Grounding Requirements
25
Field Cabinet Grounding Procedures
25
Figure 6. Grounding Requirements for PG-Flexplus Field Cabinet (Shown with Field Cabinet Door Removed)
26
Figure 7. Grounding Requirements for Multi-Field Cabinet Installation
27
AC Service Installation
28
Overview
28
Precautions
28
Utility Power Connections
28
Table 5. Maximum Current Consumption of Standard Field Cabinet Configurations
28
Bulk Power System
29
Overview
29
Description
29
Figure 8. Bulk Power System Block Diagram
29
Valere Power System
30
Valere Plug-Ins - System Controller
30
Distribution Module
30
Rectifiers
30
Batteries
31
Alarm Interface Panel
31
Table 6. Battery Options
31
Metallic Cable Termination and Wiring
32
Overview
32
Precautions
32
Weather
32
Preparation
32
AC Power
32
Field Cabinet and Hardware Preparation
33
Table 7. Sheath Identification and Function
33
Digital Cable Pair Splicing and Termination
34
Table 8. Network T1/HDSL Cable Assignments
35
PG-Flexplus HDSL (Tip/Ring) Pairs and Test Pair Splicing
36
Splice Completion
36
Table 9. PG-Flexplus HDSL Cable Assignments
37
Intrashelf Connection
38
Protector Installation
38
Figure 9. Intrashelf Cable Assignments
38
Table 10. Test Pair
38
Alarm Interface Panel
39
Battery Installation
40
Overview
40
Substitute Battery Types
40
Other DC Power Systems
40
Safety Precautions
40
IR-30, IR-40, and TEL-12-45 SLC Battery Installation
41
Procedure
41
Figure 10. Securing the Thermal Probes to Tyco IR-30 or IR-40 Batteries
41
Figure 11. Tyco IR-30 or IR-40 Battery Installation Layout in PG-Flexplus Field Cabinet
42
Tyco 12IR125 or C&D FA12-125 Battery Installation
43
Procedure
43
Figure 12. 12IR125 Battery Installation Layout (PG-Flexplus Field Cabinet Shown)
44
Figure 13. Tyco 12IR125 or C&D FA12-125 Battery Installation and Interconnection
44
Replacement and Repair Parts
45
Table 11. Replacement and Repair Parts
45
Table 12. Miscellaneous Supplemental Items
46
Cabinet Power System Turn-Up
47
Overview
47
Tools and Materials
47
Installation of Valere Modules
47
Module Names
47
Preparing to Install the Modules
47
Table 13. Standard Modules
47
Installing the System Controller
48
Installing the Rectifier Modules
48
Controller Set up
48
Verify Plant Voltage and Current
48
Post Test
48
Test Access and Alarms
49
Overview
49
Test Access
49
DC Test Pair
49
Digital Pairs
49
Figure 14. W4DF Looping Test Cord
49
Figure 15. 6W3E Test Cord
50
Figure 16. Wiring of Miscellaneous Pairs
50
Alarms
51
Alarm Interface Panel
51
Figure 17. Alarm Interface Panel
52
Figure 18. Front View Cabinet Alarms to Alarm Inputs
53
Troubleshooting
54
Equipment Alarms
54
Power System Alarms
54
Field Cabinet Environmental Alarms
55
Table 14. Power System Alarm Formats, Abbreviations, and Indicators (P221)
55
Table 15. Environmental Alarm Formats, Abbreviations, and Indicators
55
Intrusion Alarm
56
Figure 19. Door Switch
56
Field Equipment Installation and Cabinet Maintenance
57
Overview
57
Field Equipment Installation
57
Tools
57
Generic Equipment Installation Procedure
57
Maintenance
58
Routine Inspection Procedure
58
Check Battery Compartment/Hx Air Inlets
58
Check Surge Arrester
58
Check AC Circuit Breakers
58
Check GFCI Outlet
58
Inspect Field Cabinet Mounting Bracket
58
Fan Replacement Procedures
59
6F-Type Fan Unit Replacement Procedure
59
Heat Exchanger Fan Replacement Procedure
59
Batteries
60
Battery Heater Pads
60
Battery Heater Pad Inspection Procedure
60
Figure 20. Heat Exchanger Fan Installation
60
Battery Heater Pad Replacement Procedure
61
Table 16. Battery Heater Pad Inspection Procedure Test Values
61
Glossary
63
Product Support
67
Technical Support
67
Limited Warranty
67
Returns
67
Fcc Classa Compliance
68
Modifications
68
Advertisement
Advertisement
Related Products
ADC PG-PLUS
ADC Soneplex P-61-743
ADC PRL-783
ADC PG-PLUS PLL-720
ADC PG-PLUS PLL-721
ADC PG-FLEXPLUS PMU-712
ADC PG-PLUS PLL-722
ADC PG-PLUS PLL-723
ADC PG-FLEXPLUS PLL-735
ADC PG-PLUS PLL-733
ADC Categories
Network Hardware
Dryer
Medical Equipment
Thermometer
Blood Pressure Monitor
More ADC Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL