Procedures for installation of the switch
Figure 17: Job aid: Grounding lug location on a 5600 Series switch
Installing transceivers
This procedure describes the steps used to install transceivers.
1. Remove the transceiver from the protective packaging.
2. Verify that the transceiver is the correct model for the network configuration.
3. Grasp the transceiver between the thumb and forefinger.
4. Insert the transceiver into the proper module on the switch. Apply a light pressure
5. Remove the dust cover from the transceiver optical bores.
Job Aid
The following graphic shows and SFP tranceiver.
80
Avaya Ethernet Routing Switch 5000 Series Installation
to the transceiver until it clicks and locks into position in the module.
December 2010