Avaya Virtual Services Platform 9010 Manual page 19

Installing ac power supplies
Hide thumbs Also See for Virtual Services Platform 9010:
Table of Contents

Advertisement

Voltage:
Risk of injury from electric shock
Before working on this equipment, be aware of proper safety practices and the hazards involved
with electrical circuits. Use only power cords that have a grounding path. Ensure the switch is
properly grounded before powering on the unit.
About this task
When you remove a power supply, turn off power to a power supply, or remove the power cord that
connects to a power supply, you must wait 15 seconds before you return power to that power
supply. The power supply must fully power down before it can initialize again.
If you remove a power supply and do not have a replacement power supply, you must install a filler
panel in the empty power supply slot. If you do not have a replacement power supply or filler panel,
leave the original supply in place. Do not operate the Virtual Services Platform 9010 chassis with
empty power supply slots.
Procedure
1. Turn off the power supply switch at the back of the chassis.
2. Press the retaining clip to release the action lever.
3. Rotate the action lever open to unseat the power supply, moving it slightly forward.
4. Use both hands to pull the power supply from the chassis.
5. Install a new power supply or power supply filler panel in the empty slot.
6. Replace the air inlet cover.
Related Links
AC power supply installation for the VSP 9010 AC chassis
December 2014
Installing AC Power Supplies in Avaya VSP 9000
Comments? infodev@avaya.com
Removing the power supply
on page 13
19

Advertisement

Table of Contents
loading

Table of Contents