Figure 34
Core/Net backplane (rear view)
GND
VCC
+ 12
GND
SYS UTIL
GND
TRANS
VCC
SECURITY
XSM
DISPLAY
2
PANEL
1
cCNI slots:
3PE termination panel
3PE connection to
cCNI
cCNI transition card
Transition cards
and cables
(factory installed)
cCNI
cCNI
cCNI
cCNI
TRANS
TRANS
TRANS
TRANS
12
11
10
9
•
3PE cards in Network shelves "0" are connected to the 3PE Termination
Panel in Core/Net 0.
•
3PE cards in Network shelves "1" are connected to the 3PE Termination
Panel in Core/Net 1.
Replacing equipment
Slot 9-0
(factory installed)
Page 197 of 250
553-9487
Hardware Replacement