■ Reset button
At the left of the front panel, the reset button is designed for rebooting the PoE Injector Hub without turning off and on
the power.
Hardware
Reset Button
The following is the summary table of reset button
Reset Button Pressed and Released
About 1 second
About 8 seconds
Be sure that you back up the current configuration of PoE Injector Hub before resetting PoE
Injector Hub or else the entire configuration will be erased when pressing the "RESET" button.

2.1.2 LED Indicators

The front panel LEDs indicate instant status of system power, management port Link/Active and PoE port links, thus
helping administrator to monitor and troubleshoot when needed.
POE-1200G / HPOE-1200G
LED
Color
SYS Power
Green
PoE Failure
Red
Fan Failure
Red
PoE-in-use
Green
Green
Management
Port
Orange
User's Manual of POE-1200G / POE-2400G / HPOE-1200G / HPOE-2400G
Figure 2-1-5: Reset Button of PoE Injector Hub
functions:
Reboot the PoE Injector Hub.
Reset the PoE Injector Hub to Factory Default configuration.
The PoE Injector Hub will reboot and load the default IP
settings as shown below.
Function
Lights to indicate power on.
Lights to indicate PoE module failure.
Lights to indicate fans have stopped.
Lights to indicate that the port is in use and supplying 52V DC power.
Lights to indicate the link through that port is successfully established at 1000Mbps.
Lights to indicate the link through that port is successfully established at 10/100Mbps.