Siemens SIMATIC ET 200pro Series Operating Instructions Manual page 209

Low voltage converter for the distributed i/o system
Hide thumbs Also See for SIMATIC ET 200pro Series:
Table of Contents

Advertisement

7. The inverter transfers the firmware from the memory card into its memory.
The transfer takes between 5 and 10 minutes.
While data is being transferred, the LED RDY on the inverter stays red. The SAFE LED
flashes with a variable frequency.
8. Once the transfer is completed, the RDY and SAFE LEDs flash slowly (0.5 Hz) red or
yellow.
Note
Power supply failure during the transfer
The inverter firmware will be incomplete if the power supply fails during the transfer.
• Start again with Step 1 of these instructions.
SIMATIC ET 200pro FC-2 converter
Operating Instructions, 09/2017, FW V4.7 SP9, A5E34257324B AE
9.3 Firmware upgrade and downgrade
Repair
209

Advertisement

Table of Contents
loading

This manual is also suitable for:

Simatic et 200pro fc-2Simatic et 200pro fc-2 converter

Table of Contents