Siemens SIMATIC ET 200pro Series Operating Instructions Manual page 123

Low voltage converter for the distributed i/o system
Hide thumbs Also See for SIMATIC ET 200pro Series:
Table of Contents

Advertisement

Procedure
Proceed as follows to create the acceptance documentation for the drive using STARTER:
1. In STARTER, select "Create acceptance documentation":
STARTER has templates in German and English.
2. Select the suitable template and create a report for each drive of your machine or system:
– Template for the machine documentation:
– Report of the settings for the basic functions, as of firmware version V4.4:
3. You load the created reports for archiving and the machine documentation for further
processing:
4. Archive the reports and the machine documentation.
You have generated the documents to accept the safety functions.
SIMATIC ET 200pro FC-2 converter
Operating Instructions, 09/2017, FW V4.7 SP9, A5E34257324B AE
de_G120x_Dokumentation_Maschine: German template.
en_G120x_Documentation_machine: English template.
de_G120x_Basic_V4.4...: German report.
en_G120x_Basic_V4.4...: English report.
Acceptance tests for the safety functions (Page 257)
Advanced commissioning
7.7 Safe Torque Off (STO) safety function
123

Advertisement

Table of Contents
loading

This manual is also suitable for:

Simatic et 200pro fc-2Simatic et 200pro fc-2 converter

Table of Contents