About This Section; Before You Start - IBM RT User's Setup Manual

Hide thumbs Also See for RT:
Table of Contents

Advertisement

About This Section

Before You Start

This section provides a detailed procedure to check out option
installation. The checkout is an important step toward successful
system operation.
Unless you are directed otherwise, if the system has operational
problems, go to the
IB M R T PC Problem Determination Guide
to the
IBM RT PC Hardware Maintenance and Service,
problem determination.
1. Ensure that power switches are off on the system unit and
devices and that all power cables have been unplugged from
wall or other electrical outlets.
2. Connect the system unit power cable to the power connector on
the rear of the system unit. Connect the power cable for each
device to the power connector on the device.
CONTINUE TO THE NEXT PAGE
Section 9. Checking Out the Option Installation 9-3
and
and do a
all

Advertisement

Table of Contents
loading

Table of Contents