NOTE: The FRESH CUP machine weighs approximately 35 LBS. Use CAUTION when unpacking
and lifting machine.
MACHINE UNLESS THE HOT WATER TANK IS DRAINED AND EMPTY.
 
 
 
1.
Open and install the drip tray grill and place drip tray into waste bin.
 
2. Connect water fitting with strainer on the rear of machine next to the power switch.
 
 
 
 
 
1) Brewer must be installed to comply with all applicable federal, state and local plumbing
codes and ordinances.
2) Plumb brewer in to water supply using 1/4 inch copper tubing. Flush water line before
installing brewer to remove sediment. Brewer should be connected to COLD WATER
LINE for best operation.
3) Water pressure should be at least 20 lbs. For less than a 25 ft. run, use 1/4" tubing and
connect to 1/2" or larger water line. The inlet water fitting on the back of the brewer is a
1/4" flare fitting. It may be necessary to remove the plumbing cover box on the rear of
brewer to access water connection point.
4) If installed with saddle valve, the valve should have a minimum of 1/8" porthole for up to
 
25 ft. run, and 5/16" porthole for over 25 ft. runs.
 
5) Turn on water supply and check for leaks.
 
WARNING: - Read and follow installation instructions before
plugging or wiring in machine to electrical circuit. Warranty will be
void if machine is connected to any voltage other than that specified
on the serial tag.
 
 
Turn the power switch to the "OFF" position and plug the machine into a properly
installed and grounded electrical circuit. Turn on power switch to start the initial
WATER FILL CYCLE.
 
 
When tank is filled, the heater circuit will turn on-allow up to 20 min for the tank to
reach brewing temperature. Machine is now ready for programming or operation.
 