Main Circuit Electrolytic Capacitor Check - Daikin Altherma EKHBH Series Service Manual

Table of Contents

Advertisement

Additional Checks for Troubleshooting
5.13

Main Circuit Electrolytic Capacitor Check

1
Check No.14
3
3
4
5
3–62
Checking the main circuit electrolytic capacitor
Never touch any live parts for at least 10 minutes after turning off the circuit breaker.
If unavoidably necessary to touch a live part, make sure there is no DC voltage using the tester.
Check the continuity with the tester. Reverse the pins and make sure there is continuity.
Keep the tester in the
resistance measuring range.
When the pointer swings,
it means the capacitor
functions.
If the pointer does not swing at all,
or if it swings all the way
but does not return,
it means the capacitor malfunction.
ESIE06-03
Part 3 – Troubleshooting

Advertisement

Table of Contents
loading

Table of Contents