Installing Ceiling Hardware - Hunter ORIGINAL Instructions Manual

Hide thumbs Also See for ORIGINAL:
Table of Contents

Advertisement

Installing Ceiling Hardware

1. Drill two (2) 1/4" diameter holes 2-9/16" apart through the back of the outlet box into the cross
brace 2" deep. These holes are for the U-bracket bolts. Install rubber bushing and pin into the
u-bracket. Use a 11 mm wrench to install the (2) 3 1/2" lag bolts, found in the
secure the U-bracket to the joist (see Fig. 2).
Exploded View
Cross
Brace
Rubber
Bushing
U-Bracket
and Pin
Lag Bolt
Fig. 2
Hunter Fan Company
!
CAUTION
DO NOT USE LUBRICANT ON SCREWS
Ceiling
Outlet
Box
6
!
hardware bag, to
Installed View
3 1/2" Lag Bolt
41532-01 • 04/13/18

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents