1. Drill (2) 11/64" diameter holes through the outermost holes in the box 2" deep into the cross brace.
Th ese holes are for the U-bracket bolts. Install rubber bushing and pin into the u-bracket. Use a
3/8" wrench to install the (2) 3 1/2" lag bolts to secure the U-bracket to the joist (see Fig. 2).
Exploded View
Cross
Brace
6
Rubber
Bushing
and Pin
U-Bracket
Lag Bolt
Fig. 2
Hunter Fan Company
Installing Ceiling Hardware
CAUTION
!
DO NOT USE LUBRICANT ON SCREWS
Ceiling
Outlet
Box
!
Installed View
3 1/2" Lag Bolt
42704-01 • 01/29/07