The Slim Duct Built-in System FDXS09/12DVJU

ACCESSORIES
Insulation
Clamp metal
for fitting
Large and small
1 pc.
1 each
for gas pipe
for liquid pipe
Screws for conduit
Insulation tube
mounting plate
2 pcs.
1 pc.
CHOOSING A SITE
• Before choosing the installation site, obtain user approval.
Caution
• When moving the unit during or after unpacking, make sure to lift it by holding its lifting lugs. Do not exert any pressure on
other parts, especially the refrigerant piping, drain piping and flange parts.
Wear protective gears (gloves and so on) when installing the unit.
• If you think the humidity inside the ceiling might exceed 86°F and RH80%, reinforce the insulation on the unit body.
Use glass wool or polyethylene foam as insulation so that the thickness is more than 0.4in and fits inside the ceiling opening.
• Optimum air distribution is ensured.
• The air passage is not blocked.
• Condensate can drain properly.
• The ceiling is strong enough to bear the weight of the indoor unit.
• A false ceiling does not seem to be at an incline.
• Sufficient clearance for maintenance and servicing is ensured.
• Piping between the indoor and outdoor units is within the allowable limits.
(Refer to the installation manual for the outdoor unit.)
• The indoor unit, outdoor unit, power supply wiring and transmission wiring is
at least 3.3ft away from televisions and radios. This prevents image
interference and noise in electrical appliances. (Noise may be generated
depending on the conditions under which the electric wave is generated, even
if a 3.3ft allowance is maintained.)
Use suspension bolts to install the unit. Check whether or not the ceiling is
strong enough to support the weight of the unit. If there is a risk that the
ceiling is not strong enough, reinforce the ceiling before installing the unit.
(Installation pitch is marked on the carton box for installation. Refer to it to check
for points requiring reinforcing.) Select the *H dimension such that a downward
slope of at least 1/100 is ensured as indicated in "DRAIN PIPING WORK".
• The installation pitch is listed on the packing material, and should be
checked when deciding whether to reinforce the location or not.
Installation Manual
Sealing pad
Drain hose
hanger bracket
1 pc.
1 pc.
1 each
Large
Hanger (right)
insulation
Stored in
Small
outlet vent
Wireless
Remote
Air fillter
remote controller
controller holder
1 pc.
1 pc.
1 pc.
Washer for
Sealing
Clamp
material
8 pcs.
2 pcs.
6 pcs.
AAA dry-cell
Receiver kit
batteries
1 set
1 pc.
Mounting
Decorative
frame
cover
2 pcs.
Indoor Units
Washer
Screws for
Conduit
fixing plate
duct flanges
mounting plate
1 set
1 set
1 pc.
4 pcs.
24 pcs.
[ Other ]
1 pc.
2 pcs.
• Operation
Screws
manual
M4 × 25
• Installation
manual
12
or more
Control box
Maintenance
space
13/16 or more
Ceiling
Floor surface
(length : in)
2