Topology - Siemens SINAMICS G150 Operating Instructions Manual

Converter cabinet units 1750 kw 2700 kw
Hide thumbs Also See for SINAMICS G150:
Table of Contents

Advertisement

Operation
6.10 Communication via SINAMICS Link
Bus cycle and number of nodes
The bus cycle of SINAMICS Link can be operated, synchronized with the current control
cycle, or not synchronized.
● Synchronized operation is set with p8812[0] = 1.
Up to 16 stations with 500 µs bus cycle can communicate with one another via
SINAMICS Link. To do this, the maximum number of nodes must be set with p8811 = 16.
Up to 64 stations with 1000 µs or 2000 µs bus cycle can communicate with one another
via SINAMICS Link. To do this, the maximum number of nodes must be set with
p8811 = 64.
● In non-synchronized operation (p8812[0] = 0), the PZD sampling time (p2048/p8848) is
effective instead of the bus cycle (p8812[1]).
After changing over parameter p8811 and p8812, a POWER ON must be carried out to
accept the settings.
6.10.2

Topology

Only a line topology with the following structure is permitted for SINAMICS Link.
Figure 6-45
372
Maximum topology
Converter cabinet units
Operating Instructions, 07/2016, A5E03347396A