Installation
PV Array Connections
TB5 (PV GND)
Figure 3-11 PV Array Cable Routing and Terminations
Table 3-1 DC Terminal Polarity
Model
TB3 or GTFC
GT100-208-NG
PV+
GT100-208-PG
PV–
GT100-480-NG
PV+
GT100-480-PG
PV–
3–14
To make the connections from the PV Array/combiner to DC Interface:
1. Open the door to the DC Interface.
2. Route the PV Array cables conductors POSitive (PV+) and NEGative (PV-)
through the conduit to the DC Interface, entering on the underside.
3. The DC power conductor terminations are made at either the optional Fused
Combiner (GTFC) or TB3, as well as TB4 and TB5 (PV GND). See Figure 3-
11 for the location of the terminals and Table 3-1 for DC Terminal polarity for
each GT100 model.
4. Terminations for the POSitive, NEGative, Ground conductors within the DC
Interface are made using the 10 mm hardware.
5. Close the door to the DC Interface.
TB4
TB3
TB4
PV–
PV+
PV–
PV+
This manual for use by qualified installers only
TB4
GTFC
TB5 (PV GND)
TB5
PV GND
PV GND
PV GND
PV GND
153379