Planning

Conduit Entry

57 mm
(2.23in)
414 mm
(16.31 in)

Figure 2-2 Conduit Entries Beneath Enclosure, Bottom View

2–6
For a typical GT100 installation, the recommended cable entry is from beneath the
enclosure. Figure 2-2 below shows the maximum allowable areas (shaded) and
locations in which electrical conduits should be located when cable entry is from
beneath the enclosure.When routing cable and conduit, some installations may
make it necessary to penetrate the enclosure from above ground. Figure 2-3 on
page 2–7 shows the maximum allowable areas (shaded) and locations in which
electrical conduits may penetrate the enclosure of the GT100.
127 mm
282 mm
(5.00in)
(11.11in)
This manual for use by qualified installers only
877 mm
(34.54 in)
282 mm
(11.11in)
57 mm
(2.23in)
427 mm
(16.81 in)
153379

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gt100-480-ngGt100-480-pgGt100-208-pgGt100-208-ng

Table of Contents