Installation

Moving with a Sling

3–4

Figure 3-2 Forklift Lifting Locations - Underneath Unit

To move the GT100 using a sling:
1. Place the lifting slings through the box tubing on the enclosure base at the
points specified in Figure 3-3 on page 3–4.
2. Lift the GT100 from above.
3. Remove the shipping pallet from beneath the unit.
4. Once the shipping pallet is removed from the unit, use the same lifting
locations to lift the unit into the place where it may be permanently located.
1

Figure 3-3 Moving with a Sling

This manual for use by qualified installers only
66 cm fork span