WARNING: Heavy Equipment
The GT100 weighs approximately 1361 kg (3000 lb). Attempting to lift the equipment by
other than the recommended lifting points may damage the equipment or present a
personnel safety hazard and void the warranty. Keep all the doors closed and latched when
moving the enclosures. Leaving the door latches unsecured may result in damage to the
unit and void the warranty.
To move the GT100, use a forklift that has a sufficient lift capacity and has a
66 cm fork span or a crane with a minimum lift capacity of 2000 kg.
WARNING: Equipment is heavy
If lifted incorrectly, the GT100 could overbalance and cause personal injury.
CAUTION: Equipment Damage
To move the GT100, use a forklift that has a sufficient lift capacity and has a 66 cm fork
span.
To move the GT100 by forklift:
1. Place the forks of the forklift below the shipping pallet at the points specified.
2. Pay attention to the balance point (center of gravity) of the
3. Lift the Enclosure from beneath the shipping pallet.
To unpack the GT100:
1. Remove the plastic wrapping material surrounding the
2. Remove and save the front and rear enclosure skirts.
3. Remove the GT100 anchor hardware that attaches to the shipping pallet.
This manual for use by qualified installers only
.
GT100
.
GT100
153379

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gt100-480-ngGt100-480-pgGt100-208-pgGt100-208-ng

Table of Contents