The Settings In Detail; Time Programs; Holidays - Siemens AVS75.39 Series User Manual

Boiler controller
Table of Contents

Advertisement

Entering the switching
times
Switching points
Standard program
Siemens
Building Technologies
6

The settings in detail

6.1

Time programs

For the heating circuits and DHW heating, a number of switching programs are
available. They are activated in Automatic mode and control the change of
temperature levels (and the respective setpoints) via the set switching times.
The switching times can be combined, i.e. either in common for several days or in
the form of separate times for individual days. The preselection of groups of days
like for instance Mo...Fr and Sa-Su that use the same switching times simplifies
setting of the switching programs.
Line no.
HC1
HC2
HC3
500
520
540
501
521
541
502
522
542
503
523
543
504
524
544
505
525
545
506
526
546
Line no.
516, 536, 556, 576, 616
All time programs can be reset to their factory settings. Each time program has its
own operating line to make this reset.
In that case, individual settings will be lost!
6.2

Holidays

Line no.
HC1
HC2
HC3
641
651
661
642
652
662
643
653
663
648
658
668
The holiday program is used to switch the heating circuits to a selectable operating
level according to calendar dates. Up to 8 independent holiday periods can be
entered.
Important:
The holiday program can only be used in Automatic mode.
User manual RVS43.345
The settings in detail
Operating line
4/DHW
5
560
600
Preselection
Mo – Su ¦ Mo – Fr ¦ Sa – Su ¦ Mo ¦...¦Su
561
601
1st phase on
562
602
1st phase off
563
603
2nd phase on
564
604
2nd phase off
565
605
3rd phase on
566
606
3rd phase off
Operating line
Default values
No ¦ Yes
Operating line
Preselection
Period 1...8
Start
End
Operating level
Frost protection ¦ Reduced
51 / 239
CE1U2354en_021
2013-09-02

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents