About This Section
Before You Start
This section provides a detailed procedure to check out option
installation. The checkout is an important step toward successful
system operation.
Unless you are directed otherwise, if the system has operational
problems, go to the IBM RT PC Problem Determination Guide and
to the IBM RT PC Hardware Maintenance and Service, and do a
problem determination.
1. Ensure that power switches are off on the system unit and all
devices and that all power cables have been unplugged from wall
or other electrical outlets.
2. Connect the system unit power cable to the power connector on
the rear of the system unit. Connect the power cable for each
device to the power connector on the device.
CONTINUE TO THE NEXT PAGE
Section 9. Checking Out the Option Installation
9-3