7. Remove the threaded rod and rubber bushing from the turnbuckle assembly.
8. Install the floor tile that has the rubber bushing holes that are aligned with the eyebolt locations.
9. Install the rubber bushings in the floor tiles.
10. Move the frame so that the frame leveler is located over the rubber bushings.
Attention:
To avoid a tipping hazard, make sure that the frame casters do not roll into the cable
opening.
11. Turn the leveling foot of the plate assembly down until it contacts the bushing, and then level the rack
using the four leveling feet by tightening the lock nuts.
12. Lock the leveling feet by tightening the lock nut.
13. Insert the threaded rod into the inner hole of the leveler and the rubber bushing.
14. Thread down the threaded rod until the tip of the rod is approximately 1 inch inside the turnbuckle.
15. Insert the nuts and hand-tighten the nuts.
16. Repeat the previous three steps so that all assemblies are completely installed, as shown in the
previous illustration.
17. Tighten all the nuts to 40 ft-pounds.
The frame is now secured.
154
Site and Hardware Planning Information

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

7006 42tEserver pseries7006 42w7007 powerportable n407008 powerstation m207008 powerstation m2a ... Show all

Table of Contents