10 Drive Start-Up Procedure

10
Drive Start-Up Procedure
1. Install and wire the drive.
2. Energize the drive.
3. Use A1-06 [Application Preset] to initialize the drive for a special application if necessary.
4. Run the Setup Wizard to automatically set these functions:
• Control method selection
• HD/ND selection
• Motor data
• Frequency reference
• Run command source
• Acceleration and deceleration times
5. Run the motor without a load.
6. Make sure that the drive is operating correctly and make sure that the host controller is sending commands to the
drive.
7. Connect the load.
8. Run the motor.
9. Make sure that the drive is operating correctly.
10. Fine-tune and set application parameters, such as PID.
11. Do a final operation check and make sure that parameter settings are correct.
The drive is prepared to run the operation.

Setup Wizard

Refer to the motor nameplate and record the information in this table before you energize the drive.
The motor Rated Power
Motor Rated Voltage
Motor Rated Current (FLA)
Motor Rated Frequency
Motor Maximum Frequency
Motor Pole Count
52
Figure 9.1 LED Flashing Statuses
/
Figure 9.2 Relation between RUN LED and Drive Operation
Item
YASKAWA TOEPC71061737B GA800 Drive Installation & Primary Operation
Value
Number of Motor Poles
kW
V
A
Hz
Hz