v Dual power installations
Air conditioning
v Air conditioning determination
v General guidelines for data centers
v Temperature and humidity design criteria
v Temperature and humidity recording instruments
v Relocation and temporary storage
v Acclimation
v System air distribution
Planning for the installation of rear door heat exchangers
v Planning for the installation of rear door heat exchangers
v Heat exchanger specifications
v Water specifications for the secondary cooling loop
v Water delivery specifications for secondary loops
v Layout and mechanical installation
v Suggested sources for secondary loop components
Communications
v Planning for communications
5
Planning activities